Last edited by Kajijind
Saturday, August 8, 2020 | History

3 edition of Safety evaluation report related to the operation of Watts Bar Nuclear Plant, units 1 and 2 found in the catalog.

Safety evaluation report related to the operation of Watts Bar Nuclear Plant, units 1 and 2

Safety evaluation report related to the operation of Watts Bar Nuclear Plant, units 1 and 2

docket nos. 50-390 and 50-391, Tennessee Valley Authority

  • 180 Want to read
  • 20 Currently reading

Published by U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation in Washington, DC .
Written in English

    Subjects:
  • Watts Bar Nuclear Plant,
  • Nuclear power plants -- Tennessee -- Safety measures,
  • Nuclear power plants -- Licenses -- Tennessee

  • Edition Notes

    StatementPeter S. Tam ...[et al.]
    ContributionsU.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation
    The Physical Object
    FormatMicroform
    Pagination1 v. (various pagings)
    ID Numbers
    Open LibraryOL18288033M

    Final environmental statement, related to the operation of Watts Bar Nuclear Plant, unit 2, supplement 2: final report. Format Online Resource Book Published Washington, D.C.: United States Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, Description.   Specifically, this report documents the review of the Watts Bar Nuclear Plant, Units 1 and 2, Applicant response to the requirements of NUREG and NUREG This review found the Applicant provided an acceptable response reconfirming they met General Design Crite 15, and 30 of Appendix A to 10 CFR 50 for the subject : C.P. Fineman.

    The U.S. Nuclear Regulatory Commission (NRC or the Commission) has issued an exemption in response to a J , request from Tennessee Valley Authority (TVA or the licensee) to implement Optimized ZIRLO\TM\ fuel rod cladding at the Watts Bar Nuclear Plant (Watts Bar), Units 1 and 2. The NRC prepared a “Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2” (NUREG), that was published in June , and Supplements 1 through 29 that were published between September and October

    Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. and , Tennessee Valley Authority. Supplement number By. Cite. BibTex; Full citation; Abstract. This report supplements the Safety Evaluation Report (SER), NUREG (June ), Supplement No. 1 (September @article{osti_, title = {Safety evaluation report on Tennessee Valley Authority: Browns Ferry Nuclear Performance Plan}, author = {}, abstractNote = {This safety evaluation report (SER) was prepared by the US Nuclear Regulatory Commission (NRC) staff and represents the second and last supplement (SSER 2) to the staff's original SER published as Volume 3 of NUREG in April


Share this book
You might also like
Histological gonad analyses of late summer--early winter collections of bigeye tuna, Thunnus obesus, and yellowfin tuna, Thunnus albacares , from the northwest Atlantic and the Gulf of Mexico

Histological gonad analyses of late summer--early winter collections of bigeye tuna, Thunnus obesus, and yellowfin tuna, Thunnus albacares , from the northwest Atlantic and the Gulf of Mexico

Boundary element analysis in engineering continuummechanics

Boundary element analysis in engineering continuummechanics

British painting

British painting

Encyclopedia of entomology

Encyclopedia of entomology

Van Nostrands scientific encyclopedia

Van Nostrands scientific encyclopedia

Ciao, baby!

Ciao, baby!

Flood insurance study

Flood insurance study

The bridge of San Luis Rey

The bridge of San Luis Rey

The Pilgrim Hawk

The Pilgrim Hawk

Exhibition ball

Exhibition ball

Introduction to fields and circuits

Introduction to fields and circuits

A high wind in Jamaica

A high wind in Jamaica

Title winning resumes for engineers, scientists, and technicians

Title winning resumes for engineers, scientists, and technicians

relationship of voluntary and statutory agencies in the welfare services

relationship of voluntary and statutory agencies in the welfare services

weakness of the PACE special procedure for protecting confidential material.

weakness of the PACE special procedure for protecting confidential material.

Safety evaluation report related to the operation of Watts Bar Nuclear Plant, units 1 and 2 Download PDF EPUB FB2

Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 Docket Nos. and Tennessee Valley Authority U.S. Nuclear Regulatory Com mission Office of Nuclear Reactor Regulation January E PDR. NOTICE-THE ATTACHED FILES ARE OFFICIAL RECORDS OF THE DIVISION OF DOCUMENT CONTROL.

THEY HAVE BEEN. Supplement No. 2 Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 Docket Nos.

and Tennessee Valley Authority U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation RGUMV00 0 CK FIl F r0 y January -NOTICE. Supplement No.

1 Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 Docket Nos. and Tennessee Valley Authority U.S.

Nuclear Regulatory Commission Office of Nuclear Reactor Regulation September NOTICE THE ATTACHED FILES ARE OFFICIAL RECORDS OF THE DIVISION OF DOCUMENT CONTROL. Tam, P.S. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos.

and ). Supplement No. 17, report, October 1, ; United : P.S. Tam. Safety Evaluation Report Related to the Operation units 1 and 2 book Watts Bar Nuclear Plant, Units 1 and 2 (NUREG, Supplement 19) On this page: Publication Information; Abstract; Download complete document.

NUREG, Supplement 19 (PDF - MB) Publication Information. Date Published: November Docket Nos. and Tennessee Valley.

Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2 (NUREG, Supplement 13) On this page: Publication Information; Abstract; Download complete document. NUREG, Supplement 13 (PDF - MB) Publication Information.

Date Published: April Docket Nos. and Tennessee Valley Authority. Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2 (NUREG, Supplement 22) On this page: Publication Information; Abstract; Download complete document.

NUREG, Supplement 22 (PDF - MB) Publication Information. Manuscript Completed: January Date Published: February   Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2 (NUREG, Supplement 10) On this page: Publication Information; Abstract; Download complete document.

NUREG, Supplement 10 (PDF - MB) Publication Information. Date Published: October Docket Nos. and Tennessee Valley. Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant Unit 2 (NUREG, Supplement 26) On this page: Publication Information; Abstract; Download complete document.

NUREG, Supplement 26 (PDF - MB) Publication Information. Manuscript Completed: May Date Published: June This report supplements the Safety Evaluation Report (SER), NUREG (June ), Supplement No. 1 (September ), Supplement No. 2 (January ), Supplement No.

3 (January ), Supplement No. 4 (March ), Supplement No. 5 (November ), Supplement No. 6 (April ), Supplement No. 7 (September ), Supplement No.

8 (January ), Supplement No. 9 (June Author: P.S. Tam. In Junethe Nuclear Regulatory Commission staff (NRC staff or staff) issued a Safety Evaluation Report, NUREG, regarding the application by the Tennessee Valley Authority (TVA or the applicant) for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2.

Each of the following sections and appendices of this supplement is numbered the same as the section or appendix of the Author: P.S. Tam. @article{osti_, title = {Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos.

and ). Supplement No. 12}, author = {Tam, P S}, abstractNote = {Supplement No. 12 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket. @article{osti_, title = {Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos.

and ). Supplement No. 14}, author = {Tam, P.S.}, abstractNote = {Supplement No. 14 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket.

Get this from a library. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, units 1 and 2: docket nos. andTennessee Valley Authority. [U.S. Nuclear Regulatory Commission.

Office of Nuclear Reactor Regulation.;]. Get this from a library. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, units 1 and 2: docket nos. andTennessee Valley Authority. [S Peter Tam; U.S. Nuclear Regulatory Commission.

Office of Nuclear Reactor Regulation.]. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 Docket Nos. and Tennessee Valley Authority U.S. Nuclear Regulatory Commission Oftice of Nuclear Reactor Regulation February File Size: 7MB.

Safety Evaluation Report: Related to the Operation of Watts Bar Nuclear Plant, Unit 2: Supplement 24 [Office of Nuclear Reactor Regulation] on *FREE* shipping on qualifying offers. This report supplements the safety evaluation report, NUREG, Supplement No.

24 with respect to the application filed by the Tennessee Valley Authority as applicant and owner. Author U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation.

Title Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2, docket nos. and [electronic resource]: Tennessee Valley Authority.

Watts Bar Facts. Unit 1 began commercial operation in May Unit 1 is licensed for operation through Unit 2 began commercial operation in October Each unit can produce 1, megawatts of continuous electricity.

Combined, this is enough to supply about million homes daily. The plant supports approximately 1, full-time jobs. Availability of Safety Evaluation Report Supplement Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2 An Uncategorized Document by the Nuclear Regulatory Commission and the Tennessee Valley Authority on 05/23/.

Tennessee Valley Authority; Availability of Safety Evaluation Report Supplement Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2 An Uncategorized Document by the Nuclear Regulatory Commission on 12/27/@article{osti_, title = {Final environmental statement related to the operation of Watts Bar Nuclear Plant, Units 1 and 2: Docket Numbers andTennessee Valley Authority.

Supplement Number 1}, author = {}, abstractNote = {The Final Environmental Statement-Operating License (FES-OL) issued in represents the Nuclear Regulatory Commission`s (NRC`s) previous .Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos.

andTennessee Valley Authority. Supplement number 20 Technical Report.